Leveraging cross‑border collaboration to deliver European lead-cooled fast SMR to market.
Geothermal plants
Ansaldo Energia began working in the geothermal field more than a hundred years ago, when it powered what is considered the first industrial-level geothermal steam facility in history.
Geothermal expertise and in-house machinery development have enabled Ansaldo Energia to achieve a high level of efficiency and flexibility – which translates into the capacity of adapting the project to site-specific constraints and steam conditions (up to 20 bars, up to 10°C superheated).
Ansaldo Energia geothermal steam turbines are available for both 50 and 60 Hz applications.
In evidence
ANSALDO ENERGIA BACK TO PROFIT: THE BOARD OF DIRECTORS APPROVES THE DRAFT 2025 FINANCIAL STATEMENTS AND THE 2026–2030 INDUSTRIAL PLAN
The year ended with a positive net result of €20 million