Together with Candu Energy Inc. (Candu Energy), an AtkinsRéalis company, and Korea Hydro & Nuclear Power Co., Ltd.
GT26 - The best value
For the GT26 turbines, Ansaldo Energia has developed its exclusive sequential combustion technology – also adopted by the GT36 – which provides exceptional Combined Cycle performance over a wide load range and exceeds 61% net efficiency at full load.
Additional features include the ability to partially or fully shut down the second combustor in the event of low power demand – so enabling unprecendented minimum environmental load operation.
A wide range of fuel variations, that include the use of hydrogen, is possible without hardware changes.
The welded rotor means no de-stating and no disk replacement, thus benefitizing Customers with reduced maintenance costs.
The outstanding reliability of the GT26 is confirmed by >3.4 million fired hours and >44,000 starts on a worldwide fleet of +100 units.
In evidence
January
Calendar 2025 / Expertise