Engie has chosen Ansaldo Energia to optimize its thermoelectric plant in Leinì (Turin)
Assembly site
The new Ansaldo Energia Assembly Facility of Cornigliano is located in Genova, 2.5 km away from the Campi Production Plant. This 13,500 square meter site (3,500 of which covered) is where Gas Turbines are assembled on four modular stands depending on size.
In order to facilitate final product handling and shipping, the site is equipped with two cranes up to 200 tons and a high-performance hydraulic lifting solution, and has direct access to the pier.
In evidence
Ansaldo Energia News: H.E. Ambassador Lorenzo Fanara visiting Ansaldo Energia Gulf
High-level meeting at our premises in Abu Dhabi