Frame 9E

Frame 9E/9001E heavy-duty gas turbine Service and Product Offerings provide improved durability and lower life cycle costs.

Frame 9E

Ansaldo Energia's Multi-OEM Gas Turbine team offers an extensive portfolio of products and services for Frame 9E/9001E heavy-duty gas turbines.


Conversions, Modifications and Upgrades

We offer:

  • increased flexibility while maximizing the performance of your gas turbine with our Gas Turbine Optimized Package (GTOP) bringing performance upgrades that can be tailored to your operational needs. GTOP includes structured upgrades to combustion and hot gas path components with performance levels similar or exceeding OEM standard. Our Gas Turbine Optimized Package for the Frame 9E gas turbine can bring you a power output improvement up to 6% and an improved heat rate of up to 2%
  • emission reduction with our advanced (dual fuel) Dry Low NOx (DLN) combustion solutions. Simply by installing one of our systems to replace conventional combustion in a Frame 9E/9001E gas turbine makes a major impact on CO and NOx levels, with sub 9ppm offerings
  • automated gas turbine tuning with our AutoTune system to maintain emissions and combustion dynamics
  • extended lifetime of gas turbine rotors and components and maximize availability by increasing maintenance intervals to 32,000 factored fired hours.
  • globally sourced Frame 9E/9001E gas turbines to remanufacture, upgrade and relocate the unit to the customers' requirements.
  • control system upgrades including our in-house developed TC-7 control system.


Parts, Repairs and Field Services

We offer:

  • a complete range of optimized capital parts and consumable parts including our own manufactured first, second and third stage buckets, nozzles and shrouds ready for extended maintenance intervals. Advanced materials, coatings and cooling schemes maximize the durability and reliability of the parts.
  • scheduled and unscheduled inspections and overhauls, gas turbine relocation, installation and commissioning.
  • Rotor life assessment and lifetime extension based on our in-house developed model calculating rotor lifetime of your Frame 9E/9001E gas turbine rotor and other gas turbine components.

All the above-mentioned capabilities can be included in a Flexible Service Agreement to meet all your needs.

 

Experience

We have extensive experience on delivering products and services on Frame 9E gas turbines:

  • Almost 30 Frame 9E units under flexible service agreement or support contract
  • Over 100 capital parts sets sold
  • Performed more than 50 conversions, modifications and upgrades projects

Frame 9E Catalog 

Download pdf